Defective Housing

Lithographic historical reconstruction: Defective Housing

Statutory Scheme

The 2022 Act created a statutory scheme for dwellings damaged by defective concrete blocks. Its long title states that grants are to be paid for remediation, that designated local authorities are to be named for affected areas, and that the Housing Agency is to determine applications. The Act also provides for grant amounts, variation by Government order, time limits, conditions, second grants, and the handling of compensation, recovery, and charging orders. [1]

The table of contents shows that the Act is arranged in several parts, beginning with preliminary provisions and then moving to grants, matters consequent on grant, housing body dwellings, appeals, and miscellaneous matters. It also identifies provisions for the appointment of authorised officers, information sharing, disclosure of confidential information, guidelines, review of operation, offences, and penalties. This structure indicates a detailed administrative framework rather than a single compensatory payment. [1]

Application Process

Section 43 gives authorised officers significant inspection powers for the purposes of the Act. An officer may enter, inspect, examine, sample, photograph, and measure a dwelling, but entry without consent requires a warrant in defined circumstances. The section also states that refusal of consent can be treated as a withdrawal of the application. The statutory text therefore links inspection powers directly to eligibility and processing under the scheme. [2]

The same section provides that tests may be prescribed by ministerial standards and that certificates recording test results can be conclusive evidence unless the contrary is shown. That makes the inspection stage central to the administration of an application. The Act also specifies that the warrant is valid for 28 days, showing that the process is time-bound and tightly regulated at the point where factual assessment is made. [2]

Rebuild Costs

The Society of Chartered Surveyors Ireland reported average rebuilding rates for the defective concrete block scheme in the Mid West and North West. Its tables list estimated rebuild costs for different house types, with separate figures for each region and for sizes ranging from terraced estate houses to larger rural homes. The report states that the tables include demolition costs and are based on a pricing brief drawn from the February 2022 scheme report. [3] [5]

The same professional material explains that its cost figures were produced within the parameters of the scheme. It notes that the construction brief used pre-2008 building regulations because the scheme allowed like-for-like replacement and did not allow betterment. The report also says the figures were based on approximate house sizes, non-complex design plans, and basic specifications, which narrows the comparison to a defined rebuilding model rather than all forms of housing work. [3] [4]

Cost Parameters

The SCSI reports are clear about what the rebuild calculations include. They cover demolition and reconstruction, a concrete path around the house, disconnection and reconnection of utilities, making good to driveway and garden, professional fees, and VAT on specified elements. They also state exclusions, including new foundations, A-rated or NZEB homes, contents, outbuildings, garages, boundary walls, driveways beyond the stated allowance, septic tanks, and similar items. [3] [4]

The same material emphasises that construction costs vary by design, ground conditions, finish quality, location, labour, materials, and the competitive tender process. It also states that the SCSI average rates are based on surveyor input from the relevant regions. A further 2024 publication says national rebuilding costs had risen by 6.2 percent over the previous 12 months, with labour costs and skills shortages continuing to drive prices, though that report concerns house insurance rather than the scheme itself. [3] [6]

Regional Change

The SCSI’s regional updates show that the scheme’s cost data were not static. In 2023 the Society said it had reviewed average rebuilding rates for the Mid West and North West, using the same methodology as its earlier report. It also said the updated figures included demolition costs and were informed by Chartered Quantity Surveyors in the relevant region, showing an ongoing recalculation of grant-related rebuilding assumptions. [4] [5]

A 2024 SCSI release on general rebuilding costs shows further regional comparison in the wider housing market. It reports increases ranging from 3 percent in Dublin to 10 percent in the North West, and says the North West had the lowest rebuild costs while Dublin had the highest. The release is not a defective-block scheme document, but it provides a direct comparison between regional cost movements and the more specialised rebuilding figures used in the scheme. [6]

Comparative Context

The defective concrete block scheme sits within a broader pattern of Irish housing and building regulation material from the early twenty-first century. The Act refers to the Housing Agency, local authorities, approved housing bodies, appeals, data processing, information sharing, and review provisions. Another SCSI document on apartment defects records a separate housing problem and refers to support packages, remediation, and regulatory strengthening, but it concerns apartments rather than concrete block dwellings. [1] [7]

The comparison is limited to the documents themselves. One statutory text deals with concrete block remediation grants and assessment procedures; the professional papers deal with rebuilding costs and regional rates; and the apartment report addresses a different defect category. Across these records, the observable common element is the presence of formal redress or remediation mechanisms, but each source confines its detail to its own subject matter and does not describe the others’ procedures in full. [1] [3] [4] [7]

Source References

Hover over a number to see the source. Select it to open the source.

Support Emerald Archives on Buy Me a Coffee
  1. [1] Remediation of Dwellings Damaged by the Use of Defective Concrete Blocks Act 2022
  2. [2] Remediation of Dwellings Damaged by the Use of Defective Concrete Blocks Act 2022, Section 43
  3. [3] SCSI Report on Construction Costs for the Defective Concrete Block Scheme – Society of Chartered Surveyors Ireland
  4. [4] SCSI Opening Statement to Joint Oireachtas Committee on Housing, Local Government & Heritage – 13 July 2023 – Society of Chartered Surveyors Ireland
  5. [5] Mid West Average Rebuilding Rates for Defective Concrete Block Scheme – Society of Chartered Surveyors Ireland
  6. [6] Press Release: House rebuilding costs have increased by an average of 6% nationally over the last 12 months – Society of Chartered Surveyors Ireland
  7. [7] Chartered Surveyors welcome Working Group Report on Defects in Apartments – Society of Chartered Surveyors Ireland
Discussion
Sources